25+ years of executive leadership delivering mega infrastructure programmes across Telecom, Construction, Healthcare, Railway & Hospitality in Saudi Arabia, Egypt & Sudan. I improve project profitability, strengthen PMO governance, rescue complex programmes, accelerate executive reporting, and build digital automation platforms that eliminate waste.
Quantified business results delivered across 25+ years of executive programme leadership.
The business problems executives bring when they need results, not theory.
Turn around programmes that have fallen behind schedule using root-cause analysis, schedule re-baselining, and resource acceleration.
Establish PMO frameworks, governance structures, and reporting hierarchies that give executives real visibility into programme health.
Design executive dashboards and KPI architectures that surface actionable intelligence — not data dumps — for faster decision making.
Replace manual reporting cycles with automated data pipelines and ERP systems that cut reporting effort by up to 60%.
Deploy EVM discipline, risk registers, and performance baselines that protect project margins and prevent cost overruns.
Bridge traditional PMO governance with modern automation — n8n workflows, Docker containers, AI-powered analytics, and custom SaaS.
Rescue programmes at risk by diagnosing structural issues, realigning stakeholders, and implementing corrective action plans.
Build real-time Power BI and custom dashboards that give boards and C-suite instant programme health at a glance.
Establish portfolio-level governance across multiple programmes, ensuring resource optimization and strategic alignment.
Six combinations that create value most executives cannot deliver.
Most executives delegate the technical work. I design and build the ERP systems, automation pipelines, and SaaS platforms myself — then govern them at executive level.
I do not just manage PMO processes — I build the software that runs them. From MS Access VBA ERP systems to Firebase-backed SaaS, the tools I create outlast the projects.
Combining 25 years of EVM discipline with modern AI — local RAG systems, automated data pipelines, and intelligent reporting that turns project data into executive intelligence.
10 years on Saudi Telecom national FTTH programme plus construction leadership on Olympic City — two fundamentally different industries mastered at executive level.
MBA-level strategic thinking from Heriot-Watt Edinburgh Business School combined with hands-on engineering — I see both the boardroom picture and the code that powers it.
I do not just set up governance frameworks — I automate them. n8n workflows, Docker containers, and custom pipelines that enforce compliance without manual overhead.
Six national-scale programmes delivered across telecom, construction, healthcare, railway and hospitality.
ELV, BMS, CCTV, Fire Alarm & FTTH for Egypt's prestigious new Olympic city.
10-year national FTTH/FTTx rollout with 20+ concurrent projects across KSA.
Fiber optic network deployment for national railway with Alstom partnership.
Fiber backbone & FTTH infrastructure for Egypt's new Administrative Capital.
5-star hotel engineering & MEP maintenance — foundation for hospitality construction.
Healthcare infrastructure engineering — early cross-sector foundation experience.
Quantified impact across 25+ years of project controls leadership.
Not just a manager — an engineer who builds the tools that solve the problems.
A complete dual-layer SaaS ecosystem solving site expense leaks, eliminating manual paperwork delays, and giving corporate leadership a live data pipeline of decentralised spending across all project sites. Built with real-time financial workflows, role-based access, and analytics dashboards.
A highly specialized project control engine built for telecom and FTTH infrastructure rollouts, optimizing subcontractor logging, automating progress reports, and managing sitemap metadata validation across multi-region programmes simultaneously.
Real-time project health diagnostics — enter your values and get instant PMO intelligence.
Values are calculated instantly as you type. All computation runs locally in your browser — no data is sent anywhere.
Real programmes. Real problems. Real outcomes — quantified business impact, not activity reports.
Disconnected subcontractor reporting across dozens of simultaneous FTTH rollout sites in KSA. Unstructured data flows, manual verification bottlenecks, and reporting latency causing executive blindspots on a national-scale programme.
Designed and built a custom ERP system (MS Access VBA + SQL) as a centralized Single Source of Truth. Automated contractor progress tracking, integrated KPI dashboards, and deployed containerized automation pipelines (n8n + Docker) to synchronize data across all workstreams.
Eliminated manual verification hours across the programme. Accelerated executive reporting cycles from days to hours. ERP tool adopted programme-wide — estimated 60% reduction in reporting effort. Retained by STC/Norconsult for 10 continuous years.
Complex multi-system ELV, BMS, CCTV, Fire Alarm and FTTH integration on a national prestige project with a non-negotiable government deadline — Egypt's International Olympic Games City in the New Administrative Capital.
Led full-lifecycle delivery as Lead Consultant PM. Managed multi-disciplinary engineering teams, client interface with ACUD, procurement, QA/QC, and integrated master schedule across all concurrent workstreams simultaneously.
Both flagship projects — Olympic Games City ELV/FTTH and New Administrative Capital Fiber Network — delivered on schedule against high-profile national deadlines. Zero deadline breach on a nationally televised prestige project.
Deep-dive articles on project controls, risk management, cybersecurity, and strategic programme leadership.
Comprehensive 3-part series covering risk identification, quantification, mitigation, and governance frameworks.
Read Article →From attacker techniques to defense strategies — a practitioner's guide to protecting project infrastructure.
Read Article →Frameworks, schools of thought, and analytical tools for executive-level strategic decision making.
Read Article →Deep technical guides on FTTH rollout planning, OSP design, subcontractor management, and telecom project controls from 10+ years delivering the STC national fiber programme.
Practical guides on Earned Value Management, PMO governance, risk registers, and project controls from 25+ years of field experience — including a live EVM calculator.
From engineering foundations to executive programme leadership — with measurable impact at every stage.
AlSharq Office Company · Riyadh, KSA
Telecom & electrical infrastructure programme controls
Impact: Strengthened programme controls across multi-site telecom infrastructure
ECGC · Cairo, Egypt
FTTH, FTTx & OSP programme leadership
Impact: Directed FTTH/FTTx programme delivery across multiple regions
Sabbour Consulting · Cairo, Egypt
Egyptian Olympic Games City ELV/FTTH · ACUD
Impact: Zero deadline breach on nationally televised prestige project
Benya Systems / Fiber Misr–Alstom · Egypt
Egypt National Railways fiber deployment
Impact: National railway fiber infrastructure delivered on schedule
Norconsult / Saudi Telecom (STC) · Riyadh, KSA
National FTTH/FTTx/OSP/ISP rollout · 20+ concurrent projects
Impact: 10-year client retention · 60% reporting reduction via custom ERP
Siemens AG · Egypt
External telecom network · ERP system developer
Impact: Built Siemens ERP system — foundation for digital project controls career
Ready to discuss your next critical programme?
Trusted by National Programmes & Industry Leaders
25+ years of continuous client retention, industry recognition, and professional credentials.
PMP® Certified
Project Management Institute
Cisco CCNA
Network Engineering Certification
Distinguished Expert
2023 Industry Recognition
10 years of continuous retention on the STC national FTTH programme — the strongest endorsement is a client who keeps you for a decade.
Zero deadline breach on Egypt's Olympic Games City — a nationally televised prestige project with a non-extendable government deadline.